The east approach to Wuling, the Taiwan KOM Challenge course starting in Hualien, runs through a construction control zone on Highway 8. The road is open, not severed, but when you can pass and for how long is set by published time slots, and the two halves of the zone follow completely different rules. This page lays out the hours in the September 2026 notice, the waiting points along the way, and the same restrictions your support vehicle is under, so you know which plans are simply not possible before you build an itinerary.

The Single Most Important Point: You Cannot Ride This Road at Night
The construction control zone on Highway 8 closes completely from 18:30 until 06:30 the next morning. You will occasionally see the suggestion that waiting for daytime slots is a hassle so it is easier to ride at night. Under the current notice that does not work. The road is fully closed after dark, and your support vehicle cannot get in either.
Before that there is a clearing period: 18:00 to 18:30 on the eastern section (Tianxiang to the Taroko entrance) and 16:30 to 18:30 on the western section (Guanyuan to Tianxiang). During those windows the zone is exit-only. In practice this means you must be past Guanyuan by 16:30, or you are not getting up the mountain that day.
Two Sections, Two Sets of Rules, Do Not Merge Them Into One Table
The notice treats the highway as two separate sections with very different rules. The eastern half is a case of only a few minutes being usable; the western half is open all day but with waiting points along the route. Reading the two sets of hours as one schedule is the fastest way to build an itinerary that cannot work.
The eastern section has five release windows a day. Two of them, 10:00 to 10:05 and 15:00 to 15:05, are only five minutes long. In practice only the 90-minute window at 06:30 and the two hour-long windows at midday and early evening are worth planning around.
| Section | Daytime access | Clearing (exit only) | Overnight |
|---|---|---|---|
| East: Tianxiang to Taroko entrance (km 167.7-184.5) | Five windows daily: 06:30-08:00, 10:00-10:05, 12:00-13:00, 15:00-15:05, 17:00-18:00 | 18:00-18:30 | Closed 18:30 to 06:30 |
| West: Guanyuan to Tianxiang (km 114.6-167.1) | Two-way 06:30-16:30 (with construction points en route) | 16:30-18:30 | Closed 18:30 to 06:30 |
The Western Section Is Open in Daylight, but There Are Four Waiting Points
The western section is two-way, so you do not have to catch a window for the section as a whole. But there are four separate construction points along it, each releasing traffic on its own schedule. Allow extra time for waiting, and accept that the total cannot be calculated precisely.
Note that the five windows at Huoranting are not the same as the five on the eastern section: the 09:45 and 14:45 slots each differ by 15 minutes. The two tables look alike and must not be used interchangeably.
| Location | Highway 8 | Release schedule |
|---|---|---|
| Huoranting (near Luoshao) | km 157.7 | Five windows during works 2-24 Sep: 06:30-08:00, 09:45-10:25, 12:00-13:00, 14:45-15:25, 17:00-18:00 |
| Hualu Creek (near Cien) | km 147 | Timed to match the five windows at the Tianxiang end |
| Guanyuan | km 116.5 | Released roughly once an hour |
| Dayuling | km 112.6 | Released roughly once an hour |
Route Profile: Which Climb Falls Under Which Rule
From Qixingtan the first 25 kilometres are almost flat; the real climbing starts at the Taroko entrance. From 60 metres above sea level to 3,275 metres at Wuling, the route gains over 3,200 metres in 78 kilometres. The two background colours below match the two control regimes described above.
Laying the terrain over the control makes one thing obvious: the heaviest climbing, Tianxiang up to Dayuling, sits entirely inside the western section, and that section has no single release window to wait for, only four separate construction points along the way.

Can You Still Do It in One Day Under These Rules
Yes, but there is only one way to do it: take the first 06:30 window at the Taroko entrance, use those 90 minutes to clear Tianxiang, ride the western section through the day, and be past Guanyuan before 16:30. After Dayuling you join Highway 14A to Wuling, which is outside the scope of this notice.
There is not much margin in that plan. Tianxiang to Guanyuan climbs close to 1,900 metres and you still have to absorb the waiting time at four construction points. If you are not confident about that, or you would rather not have the whole day dictated by the clock, there are two alternatives: enter on the 17:00-18:00 window and stay overnight at Tianxiang, then start at 06:30 with a full day ahead of you; or switch to the western approach from Puli, which avoids this control entirely.
Your support vehicle is under the same control and cannot follow you freely. This is the part people most often overlook when planning: the vehicle cannot be where you need it when you need it, so supplies and spares have to be distributed in advance.
This Page Will Go Out of Date: Two Things We Have Not Confirmed
Control hours are published month by month. Everything on this page comes from the September 2026 notice, and the Huoranting windows only run to 24 September. If your trip falls in October or later, look up that month and do not reuse this page.
One more thing we have not verified: we did not find any exemption for bicycles or slow vehicles in the text of the notice. Some controlled sections treat slow vehicles differently from cars, but until that is confirmed with the authority, plan on the assumption that bicycles are controlled the same as cars.
Checking again a week before departure is the cheapest insurance. The sources we use are listed below.
Highway 14A right now
The notices and camera images below are fetched from the highway authority when you open this page, with notices lagging by ten minutes at most. Monthly statistics only give you odds. Checking here the night before and again at dawn tells you far more.
Live notices from the highway authority
台14甲線雙向31K至32K武嶺路段壅塞,且周邊停車場已滿。
台14甲線雙向31K至32K武嶺路段壅塞,且周邊停車場已滿,建議用路人改往其它風景區,勿違停路邊以避免影響通行安全,警察將持續加強取締違規,並請注意路況小心駕駛。
台14甲線雙向29K至32K昆陽至合歡山路段,周邊停車場已滿,建議用路人斟酌前往。
台14甲線雙向29K至32K昆陽至合歡山路段,周邊停車場已滿,建議用路人斟酌前往,以及請勿違停路邊以避免影響通行安全,警察將持續加強取締違規,並請注意路況小心駕駛。
台8線114K+600~167K+300(合歡派出所至天祥)沿線災修工區施工管制
6時30分至16時30分開放通行;18時30分至翌日6時30分夜間封閉(含假日,10/9~10/11及10/24~10/26不施工管制,雙向通行,18時30分後夜間封閉)
Live cameras


FAQ
Is the eastern Central Cross-Island Highway closed?
No. The road is open; what applies is time-based construction control. It opens in published windows during the day and closes completely from 18:30 to 06:30.
Can I ride at night to avoid the control?
No. From 18:30 to 06:30 the whole section is closed, which is stricter than the daytime rules, and support vehicles cannot get in either.
Can the support vehicle follow the rider the whole way?
Not inside the control zone. The support vehicle is held to the same release windows as the bike and has to enter and leave with the same group, so it cannot appear at any point at any time. Supplies and spares need to be distributed in advance.
Is there another way up Wuling that avoids the control?
Yes. The western approach starts in Puli, Nantou, and uses Highways 14 and 14A, avoiding both controlled sections entirely. The trade-off is that it is not the Taiwan KOM race course and it does not pass through Taroko Gorge.
Sources
Rules and road conditions change — always check the official announcements before you travel.
Related guides
- Wuling Hehuanshan Cycling|Taiwan's Highest Road, 3,275m
- When to Ride Wuling Month by Month, and What 3,275 m Means Where You Come From
- Taiwan Twin Towers 520: Support Vehicles, Checkpoints, and What to Know
Need a support vehicle?
Tell us your plan and we will suggest an option based on group size, bike count, and days.